• 1 909 989 7771

13100 & 13200 Loop Road, Fontana, CA
BUILDING SPECS

Building West

13100 Loop Road, Fontana, CA

Building

• 310,279 SF (3,065 SF mezzanine)

Office

• 6,727 SF of 2-Story Office Space

Clear Height

• 36’ clear (inside 1st column line from docks)

Columns

• 56’-0” by 50’-0” typical column spacing (60’ spacing in speed bay)

Parking

• 164 auto stalls; 45 trailer stalls

Construction

• Concrete tilt-up walls, steel truss and girder roof structure with a panelized wood deck

Doors

• 47 Dock High Doors (9’ x 10’)
• 2 Grade Level Doors (12’ x 15’)

Fire Protection

• ESFR

Paving

• 100% concrete site paving; including all car and truck parking areas and drive aisles

Roofing

• Class “A”, 4-ply asphaltic built-up roof system with fifteen (15) year, no dollar limit warranty

Roof Structure

• Metal Truss hybrid

Insulation

• White Scrim Foil

Entries

• Decorative scoring and/or colored pavement at drive entries and office pod entrances

Skylights

• 3% coverage
• Skylights to be acrylic single dome impact and wind resistant

Warehouse Slab

• 7” thick 4,000 psi concrete
• MM80 joint filler in the speed bay
• Seal concrete floors with one (1) coat of water based sealer, Lapidolith or equal
• Slab to have minimum flatness of FF-50 and levelness of FL-35

Utilities

• Sewer service at building corners
• Domestic water service to office locations
• Irrigation water service with backflow preventer
• Telephone and data conduits only – tenant to provide all data and phone wiring and service

Electrical

• 4000 amp pull section (UGPS) with 1200 amp service
• Conduits in speed bay for future power distribution and EV charging capability
• 1 EV charging station

Landscaping

• Drought tolerant landscaping to be used where possible, automatic sprinklers

Building East

13200 Loop Road, Fontana, CA

Building

• 217,785 SF (3,065 SF mezzanine)

Office

• 6,727 SF of 2-Story Office Space

Clear Height

• 32’ clear (inside 1st column line from docks)

Columns

• 52’-0” by 50’-0” typical column spacing (60’ spacing in speed bay)

Parking

• 140 auto stalls; 33 trailer stalls

Construction

• Concrete tilt-up walls, steel truss and girder roof structure with a panelized wood deck

Doors

• 36 Dock High Doors (9’ x 10’)
• 2 Grade Level Doors (12’ x 15’)

Fire Protection

• ESFR

Paving

• 100% concrete site paving;
• Including all car and truck parking areas and drive aisles

Roofing

• Class “A”, 4-ply asphaltic built-up roof system with fifteen (15) year, no dollar limit warranty

Roof Structure

• Metal Truss hybrid

Insulation

• White Scrim Foil

Entries

• Decorative scoring and/or colored pavement at drive entries and office pod entrances

Skylights

• 3% coverage
• Skylights to be acrylic single dome impact and wind resistant

Warehouse Slab

• 6” thick 4,000 psi concrete
• MM80 joint filler in the speed bay
• Seal concrete floors with one (1) coat of water based sealer, Lapidolith or equal
• Slab to have minimum flatness of FF-50 and levelness of FL-35

Utilities

• Sewer service at building corners
• Domestic water service to office locations
• Irrigation water service with backflow preventer
• Telephone and data conduits only – tenant to provide all data and phone wiring and service

Electrical

• 4000 amp pull section (UGPS) with 1200 amp service
• Conduits in speed bay for future power distribution and EV charging capability
• 1 EV charging station

Landscaping

• Drought tolerant landscaping to be used where possible, automatic sprinklers